Aviation System Engineering (ARP4754A/B)
S1 Insight
Problems and Gaps
Based on ARP4754A/B, a comprehensive assessment will be conducted on the customer's system full life cycle development process, as well as the supporting organizational structure and resource capabilities. The assessment items include:
Evaluation of system development full life cycle process status
Assessment of whether the tools and environment used in the process are adequate
Assessment of whether the configuration management process and tools environment meet the requirements
Assessment of the completeness of the process assurance monitoring process system
S2 Plan
Service Implementation Plan
To define the framework and scope of consulting service based on the status evaluation result and required safety DAL level, and come out with a service implementation plan, including:
Developing a reasonable consulting service schedule per customer expectations
Determining the work mechanism of the consulting service per customer expectations
Grouping consulting service experts
Setting up regular meeting rhythm
Defining consulting service deliverables
Setting consulting service acceptance criteria
S3 Implementation
Training and Implementation
Training:
Basic Training on ARP4754A/B
Key Elements Training on System Development Process (as needed)
Template Documents:
Civil Aircraft System Engineering Process Manual – Based on Best Practices of Existing Models
System Development, Process Improvement:
Preparation of System Development System Documents
Project R&D Activities and Review Support:
System Planning and Standard Document Preparation and Review
System Requirements Document Preparation and Traceability Establishment and Review
System Preliminary and Detailed Design Development and Review
System Testing & Verification Support
System Configuration Management and Process Assurance
S4 Optimization
Evaluation and Optimization
Whole-process monitoring of training and support activities:
Training course feedback and evaluation mechanism
Process & system optimization feedback and improvement
Phased acceptance mechanism and criteria
Continuous Insight
Next stage
Problem gathering
Gap analysis
Plan development
Monitoring
Evaluation & Optimization
Related Recommendation
Please feel free to contact us via email or submit your requirements directly online to obtain details