-
15%
Cost savings
-
25%
Shortened cycle time
-
15%
Sales growth
Managing the impact of design changes over time
Lifecycle Based Program Management
With the continuous increase of system/product complexity, entreprises often lack of structurized globally optimal decision framework to be ROI driven, know issues ahead of time and make predicted resouces allocation. AirEdge NPD/NPI solutions enable entreprises via LCVSM (Life Cycle Value Stream Management) program managmeent solutions.
Business Challenges
-
Insufficient ROI Drive
Projects lack of structurized decision making system to meet business goals without lifecycle and financial twin models.
-
High Airworthiness Risks
Key decisions during product development, production, and operations phases lack structurized framework which result in unpredictable activities and reworks.
-
Prelonged Development Cycles
Inefficient and Only-Next-Milestone driven mode leads to frequent rework without a globally optimal view.
The Architecture of Solutions
Typical Solutions
-
Lifecycle Management
Establish lifecycle models for target businesses (products/supplier products) with compliance and internal control checkpoints (Stage-Gates) and pre-set checklists.
Conduct global compliance audits based on airworthiness and economic (DCF financial digital twin) metrics at each stage.
-
The Establishment & Maintenance of the Development Ecosystem
Develop and maintain lean lifecycle value stream management models based on ISO21500/ISO15288.
Build and maintain a comprehensive compliance ecosystem for systems/safety/software and hardware development according to ARP4754B/ARP4761A/DO254/DO178C standards.
Implement and maintain airworthiness compliance procedures according to Part 23/25/92, etc., forming a complete airworthiness and compliance service package for civil aviation products.
NPD/NPI
-
NPD/NPI
-
System Engineering
-
Airborne Equipment & Component Development
-
Subcontract Management
Compliance Driven Development Powered by AirEdge
Incorporate and facilitate compliance throughout the lifecycle process pilot