Airborne Electronic Hardware (DO-254)
S1 Insight
Problems and Gaps
To conduct a full-scale evaluation of the customer’s organization and resource capabilities against the requirements for the development lifecycle of airborne electronic hardware as recommended in DO-254 standard, including:
Current status of airborne electronic hardware development process
Requirement development & management process and tool environment in place or not
Configuration management process and tool environment compliant or not
Process assurance monitoring process complete or not
FPGA simulation & verification tools and environment in place or not
S2 Plan
Service Implementation Plan
To define the framework and scope of consulting service based on the status evaluation result and required safety DAL level, and come out with a service implementation plan, including:
Developing a reasonable consulting service schedule per customer expectations
Determining the work mechanism of the consulting service per customer expectations
Grouping consulting service experts
Setting up regular meeting rhythm
Defining consulting service deliverables
Setting consulting service acceptance criteria
S3 Implementation
Training and Implementation
Training topics:
DO-254 basics
Key factors in airborne electronic hardware development process (as necessary)
Tool qualification
Inspection points of interest
Templates and checklists:
Airborne electronic hardware development lifecycle data & documents set - based on best practices from certified platforms
System establishment and process improvement:
Airborne electronic hardware system and process documents establishment
Development activities and inspection support:
Plan and standard documents development and review
Requirement documents and traceability development and review
Preliminary and critical design development and review
Verification activities including simulation and tests
Configuration management and process assurance process
Engineering gate reviews and trial SOI reviews
S4 Optimization
Evaluation and Optimization
Whole-process monitoring of training and support activities:
Training course feedback and evaluation mechanism
Process & system optimization feedback and improvement
Phased acceptance mechanism and criteria
Successful exit of formal SOI reviews as acceptance criteria
Continuous Insight
Next stage
Problem gathering
Gap analysis
Plan development
Monitoring
Evaluation & Optimization
Related Recommendation
Please feel free to contact us via email or submit your requirements directly online to obtain details